| Corrorion class | CX |
| Coating | Metallized with ZnAl + paintsystem |
| Metallization with ZnAl15 | 120 µm |
| Epoxy paint | 2x200 µm |
| Polyurethane paint | 50 µm |
Country : Denmark
Zone : Baltic Sea
Year of construction : 1991
Number of wind turbines : 11
Park disassembled in 2018 after more than 25 years of service. Wind turbines in perfect condition at the time of disassembly.